How to study this deck

Use these investments and portfolio management flashcards as a retrieval drill, not as a page of notes. For each card, read the question, try to give a precise answer, then reveal it. Grade the answer by how much you recalled: Again if you could not retrieve it, Hard if it took effort or was incomplete, Good if it was correct, and Easy if it came quickly and accurately. Be honest: recognising a formula after seeing it is not the same as recalling it unaided.

This is a general finance deck, not a substitute for your course’s terminology. Check your own lecture notes for conventions such as whether returns are annualised, whether a rate is nominal or effective, and how your course defines risk measures. In MySummaries, a deck built from an Investments and Portfolio Management board could look like this:

Cards — Investments and Portfolio Management18 due

How do you calculate a holding-period return when an investment pays income?

Formula: (ending price − starting price + income received) ÷ starting price.

All 18 cards
How do you calculate a holding-period return when an investment pays income?Formula: (ending price − starting price + income received) ÷ starting price.
What is the arithmetic mean of returns 4%, 8% and −3%?Mean: (4% + 8% − 3%) ÷ 3 = 3%.
How do you calculate the geometric mean return over n periods?Formula: [(1 + r₁)(1 + r₂)…(1 + rₙ)]^(1/n) − 1.
What is the exact relationship between nominal return, real return and inflation?Fisher relationship: 1 + nominal return = (1 + real return)(1 + inflation rate).
What does diversification reduce, and what risk does it not eliminate?Risk: It can reduce asset-specific risk; it does not eliminate market-wide systematic risk.
What is the two-asset portfolio variance formula?Formula: w₁²σ₁² + w₂²σ₂² + 2w₁w₂Cov(R₁,R₂).
What is the CAPM expected-return formula?Formula: Expected return = risk-free rate + beta × (expected market return − risk-free rate).
Under CAPM, what expected return follows from a 3% risk-free rate, 8% market return and beta of 1.2?Calculation: 3% + 1.2 × (8% − 3%) = 9%.
What normally happens to a fixed-rate bond’s price when market yields rise?Relationship: Its price falls, all else equal.
A bond pays an annual coupon of 6 and trades at 95. What is its current yield?Calculation: 6 ÷ 95 = 6.32% (approximately).
What does yield to maturity represent, assuming the bond is held to maturity and payments are made as promised?Meaning: The discount rate that equates the bond’s price with the present value of its promised cash flows.
A bond has modified duration of 5. What is the approximate price change if its yield rises by 1 percentage point?Approximation: −5%; price change ≈ −modified duration × change in yield.
How do you calculate net present value?Formula: Present value of expected cash inflows minus the initial investment and any other costs included in the analysis.
What discount rate defines the internal rate of return?Definition: The rate at which the project’s net present value equals zero.
How is the Sharpe ratio calculated?Formula: (portfolio return − risk-free rate) ÷ standard deviation of portfolio returns.
What is tracking error?Definition: The standard deviation of the portfolio’s active returns, where active return is portfolio return minus benchmark return.
What does portfolio rebalancing do?Purpose: It restores portfolio weights towards chosen target allocations after market movements change them.
What does the efficient frontier represent?Definition: Portfolios offering the highest expected return for each level of risk, or the lowest risk for each expected return.

That is a MySummaries deck, filled with investments and portfolio management material. Yours is written from your own notes. Start free

Work through the cards by topic

Start with returns. The first three cards separate a single holding-period result from an average across periods. The arithmetic mean treats each period’s percentage return as a value to average; the geometric mean accounts for compounding. For example, a 10% gain followed by a 10% loss does not leave an investment unchanged: 1.10 × 0.90 = 0.99, a 1% loss overall. That is why an arithmetic average is not a substitute for a compounded multi-period return. The Fisher relationship is exact; simply subtracting inflation from a nominal rate is an approximation that is more reasonable when both rates are small.

Next, retrieve risk concepts before moving to valuation. Diversification depends on how assets move together, not just on how many holdings are in a portfolio. The covariance term in the two-asset variance formula captures that relationship. In an exam or assignment, state what each weight and variance refers to, and do not confuse covariance with correlation. CAPM is a model-based expected return, not a guaranteed return. In the numerical card, the market risk premium is 8% − 3% = 5%; multiplying it by beta and adding the risk-free rate gives 9%.

For the bond cards, say the direction of the price-yield relationship before attempting a calculation. Current yield uses the annual coupon divided by the current market price; it does not account for the difference between the purchase price and the amount repaid at maturity. Yield to maturity incorporates the bond’s promised cash flows under its assumptions. Modified duration is a first-order estimate: the minus sign matters, and a yield rise of one percentage point is a change of 0.01, not 1. The duration estimate becomes less accurate for larger yield changes because it does not capture convexity.

Finish with project appraisal and portfolio management. NPV depends on discounted cash flows and a chosen discount rate; IRR is the rate that makes NPV zero. When comparing projects, do not claim that IRR and NPV must always rank alternatives identically. The Sharpe ratio measures excess return per unit of total return variability, while tracking error measures variability in returns relative to a benchmark. Rebalancing is a decision to return to target weights, not a prediction of which asset will perform best next. The efficient frontier describes a set of portfolios, not one universally optimal portfolio: an investor’s choice depends on their objectives and constraints.

A practical first session is about 25 minutes. Spend roughly 15 minutes attempting the cards and grading each response, then use 10 minutes to revisit every Again or Hard card and explain the formula or distinction in your own words. On the next review, prioritise those difficult cards before the ones you already recall. If you repeatedly miss a formula, add a worked example to your revision material; a formula without practice applying it can be easy to recognise but hard to use.

The core to keep available

After the drill, reduce the deck to a few anchors you can reproduce without prompts. This is not a replacement for the cards: it is a quick check that the key relationships have stuck. A compact core from this deck looks like this:

Key pointsInvestments and Portfolio Management
Holding-period return = (ending price − starting price + income) ÷ starting price; geometric mean accounts for compounding.
Two-asset portfolio variance includes the covariance term: w₁²σ₁² + w₂²σ₂² + 2w₁w₂Cov(R₁,R₂).
CAPM: expected return = risk-free rate + beta × market risk premium; bond prices normally fall when yields rise.
Modified duration estimates percentage price change as −duration × yield change; a 1 percentage point rise with duration 5 implies about a 5% price fall.
NPV is discounted inflows less investment and included costs; IRR is the discount rate at which NPV equals zero.

Use the core as a blank-page test: write the relationships from memory, then compare them with your notes. Pay particular attention to units and signs. A duration calculation can have the right number and still be wrong if the price direction is reversed; a return calculation can be wrong if income is omitted or the denominator is not the starting investment.

Turn repeated misses into a small repair task

A missed card is useful only if you work out why it was missed. Was the formula forgotten, was a term confused with another measure, or did the arithmetic go wrong? Repair one cause at a time. For example, if you know modified duration but repeatedly mishandle the yield change, practise converting percentage points into decimal changes before multiplying. If you confuse current yield and yield to maturity, write down what each calculation includes and excludes.

A remediation tray for a repeated duration error could contain this prompt:

Remediation tray

You lost this mark twice: a bond has modified duration 5.2 and its yield rises by 0.75 percentage points. What is the approximate percentage price change, and why is the sign negative?

Add cardDismiss

Answer the tray prompt, then explain the reasoning aloud: 0.75 percentage points is 0.0075, so the estimate is −5.2 × 0.0075 = −0.039, or approximately a 3.9% price fall. The sign is negative because bond prices and yields move in opposite directions, all else equal. If the answer is still hesitant, return to the duration card rather than simply marking the tray task complete.

How MySummaries helps

MySummaries lets you build a revision board from your own finance notes and generate flashcards from that material, so you can replace or extend this general deck with the definitions, notation and examples used in your course. Review the cards with spaced repetition and use repeated misses to identify what to practise next. Open MySummaries.