Exam preparation

FRM

2 guides for this exam — how to prepare, what to practise, and how to know it has gone in.

Plan your FRM revision: a day-by-day calendar up to your exam date, free and without an account.

A written answer, marked

A question from an FRM mock paper, answered and marked. From How to Prepare for FRM: A Practical Study Guide.

Paper — Risk measurement and application02:10
78%Risk measurement and application — marked3/4 marks · 02:10 taken

A portfolio has a one-day 99% VaR of $2.0 million. Estimate its 10-day 99% VaR using square-root-of-time scaling, and state what the estimate means and one important limitation.

3/4

Using square-root scaling: $2.0m × √10 = about $6.32m. This is an estimated 10-day 99% VaR. The result depends on the assumptions behind the scaling rule.

The setup, arithmetic and interpretation of the quantile are sound. The answer recognises that scaling has assumptions but does not name them or explain what VaR leaves out.

Missed

State that scaling assumes conditions such as stable volatility and independent returns; serial dependence or changing volatility can make the estimate unreliable.

Clarify that VaR does not measure the size of losses beyond the 99th-percentile threshold.

Model answerUsing the square-root-of-time approximation, 10-day VaR ≈ $2.0m × √10 = $6.32m. This is an estimated loss threshold at the 99% confidence level over ten days, under the model’s assumptions. The approximation requires conditions such as stable volatility and independent returns; it may be unreliable when these fail. VaR does not quantify the severity of losses beyond the threshold, so a tail measure such as expected shortfall may add information.

Start studying for FRM

Yours are written from your own notes, and the free plan needs no payment details.

Guides

Preparing for FRM? Build your FRM board from your own notes — the cards, papers and lectures are written from it. Free plan: 20 cards, a paper, a lecture and a viva to try.

Start on MySummaries

Other exams